Patio Construction
Ground-Level Living, Done Solid.
Concrete, paver, and covered patios across southeastern North Carolina, built on the base preparation that decides whether a patio lasts five years or fifty.


A patio is only as good as what is under it. Our coastal-plain soil is sandy, moves with moisture, and swallows shortcuts: pour concrete on unprepared ground and it cracks in two winters; lay pavers on an inch of sand and they wave and sink by year three. Base work is invisible and it is ninety percent of the job.
We build patios the way we build everything else: excavate to stable soil, compact real base material in lifts, manage the water, and then put the pretty surface on top. That order is why our patios stay flat.
Patio Types We Build
- Poured concrete patios. Properly compacted base, steel reinforcement, control joints cut where the slab wants to crack anyway, and finishes from smooth trowel to broom to exposed aggregate.
- Paver patios. Excavated and compacted aggregate base, screeded bedding, edge restraint that keeps the field locked, and polymeric sand joints. Repairable by design: lift, fix, relay.
- Stamped and decorative concrete. Stone and slate patterns in colored concrete, sealed for our sun. A fraction of natural stone’s cost with most of its look.
- Covered patios. Roofed patio structures tied into the house correctly, from simple shade covers to fully framed outdoor rooms with fans and lighting, built alongside our deck and framing work.
- Fire pit and seating areas. Built-in fire features with proper clearances, seat walls at actual seat height, and layouts planned around how many people you really host.
- Drainage integration. Slopes away from the foundation, channel drains where hardscape meets house, and downspout management so the patio sheds water instead of pooling it.
Water Decides Everything
Ten inches of rain in a weekend is a normal event here. A patio that ignores drainage becomes a pond, then a frost-heave field, then a trip hazard. Every patio we build starts with a water plan: where it comes from, where it needs to go, and what carries it there.
That is doubly true against the house. A patio pitched even slightly toward the foundation feeds water to your crawlspace every storm. We pitch away, always, and prove it with a level before we leave.
From Slab to Outdoor Room
Some patios are a clean concrete pad for the grill. Some are covered rooms with fans, lights, and a TV mount that get used nine months a year. We build across that whole range in Lumberton, Pinehurst, Elizabethtown, and the surrounding towns.
See finished outdoor work in the gallery, then set up a free consultation and we will design around your yard’s actual grade and drainage.
Three Backyards, Three Patios
The grill pad that grew.
Started as a request for a concrete pad, became a broom-finished patio with a seat wall once we mapped the drainage and the traffic path. Costs were shown for both; the owner chose with real numbers.
The paver entertaining space.
Four hundred square feet on compacted aggregate base, edge-restrained, with a fire pit at code clearance. Hosted its first crowd the same weekend it was finished.
The pond that used to be a patio.
An inherited slab pitched toward the house, feeding the crawlspace every storm. Demolished, regraded, rebuilt pitching away, with a channel drain at the door. The crawlspace has been dry since.
Patio Construction Questions, Answered
Concrete or pavers: which is better?
Concrete costs less for the same square footage and gives a clean single surface; when it cracks, repairs show. Pavers cost more up front but repair invisibly and handle soil movement better. On this soil, that repairability is worth thinking about. We price both honestly at the consultation.
Do patios need a permit?
A ground-level uncovered patio usually does not. Covered patios and anything structural attached to the house do. We check the rules for your address and pull whatever the project needs.
How long does a patio take to build?
Most uncovered patios run three days to a week including excavation, base compaction, and finish. Concrete needs cure time before furniture: we will tell you exactly when it is ready to load. Covered patios run two to three weeks.
Why did my old patio crack and sink?
Almost always base failure: poured or laid on topsoil, uncompacted fill, or ground that stays wet. The surface was never the problem. We excavate to stable soil and rebuild the base, which is why the new one behaves differently. Call (910) 785-9253 for an honest look at whether yours is repairable or a rebuild.
Can you match a patio to my existing deck or porch?
Yes. Patios that step down from decks, wrap porches, or connect outdoor spaces are common projects for us. Heights, transitions, and drainage get planned as one system so the whole backyard works together.
Can you extend or resurface my existing concrete patio?
Extensions work well when the new section gets its own proper base and an intentional joint at the seam. Resurfacing sound-but-ugly concrete with overlays also works. Resurfacing a cracked, settling slab does not: the movement telegraphs straight through, and we will tell you honestly which case yours is.
How soon can I use my new patio?
Pavers: immediately. Concrete: foot traffic the next day, furniture after about a week, and vehicles nowhere near it for a month if it is a driveway-adjacent pour. We leave you a simple cure-time card so there is no guessing.
Do you install patio drainage if my yard already floods?
Yes, and sometimes that is most of the project. Channel drains, catch basins, and regrading get designed before the surface, because hardscape added to a flooding yard without a water plan just makes a cleaner-looking flood. Fix the water first and the patio lasts fifty years.
Hardscape With a Water Plan
Concrete and pavers are permanent decisions on land that moves with water. Before any surface goes down we read the yard: where the roof drains, where the grade runs, what the soil does after a week of rain. The patio design answers those facts, which is why our slabs stay flat while the neighborhood’s crack and tilt.
It is also why we say no to certain requests: a patio in a swale is a pond with furniture, and pouring it would waste your money. We would rather regrade the yard first or move the patio ten feet than build something we will not put our name on.
Get a Patio That Stays Flat.
Base work done right, water managed, surface built to be lived on. The consultation is free.